For
more than fifty years, the UK piling industry has relied upon the tripod
method of pile installation to install 450 and 600mm diameter piles in
limited access and low headroom situations. Little has changed over that
period, save for the introduction of diesel and electric powered machinery.
The basic technique remains virtually unchanged.
Piling Solutions was formed in August 1998 to develop equipment that was capable of installing high capacity 450 and 600mm diameter augered piles in low headroom and limited access situations, offering an alternative to the more traditional tripod system.
In addition to our current piling areas; Auger Injection, Sectional Auger Rotary and Cased Driven piling, we now offer:
We cater for piling diameters between 65mm and 2100mm.
We take pride in our company and endeavour to live up to its name by offering "Piling Solutions" that satisfies all of our client's piling wants and needs.
|